
Built in the field.
Proven on the schedule.
Mechanical scopes delivered within larger construction teams, where coordination and accountable execution matter most.
Download our résumé
01Equinox Hudson Yards
Water-cooled VRV, secondary condenser-water loop and a new front-end BMS engineered around critical fitness-club sequences.
0275 Varick Street
31 water-source heat pumps, DOAS systems and rapid-response hot-yoga controls for a high-performance wellness environment.
03Burlington Headquarters
Plate-frame heat exchangers, 80 tons of water-to-refrigerant equipment, 80 fan-coil units and energy-recovery ventilation.
045 Bryant Park
Tenant fit-out and expansion with sheet metal, terminal boxes and integration into the existing base-building BMS.
05Ocean County Mall
Rooftop HVAC, dedicated outdoor air and a commercial kitchen exhaust system designed for coastal conditions.
Bring Elite
to the table.
Share the scope and bid date. Attach plans when your prepared email opens.
Invite Us to Bid